Project Datasheet

Bridges Market Sector

Project: East Coast Main Line Bridge for the CTRL  

For more details please contact:

Peter Miller
Director
Watson Steel Structures Ltd
+44 (0) 1204 696 675
enquiries@watsonsteel.co.uk
Client: Union Railways
Location: London
Greater London
Country: England
Partners: Main Contracotr: Kier Nuttall JV
Architect: Rail Link Engineering
Engineer: Rail Link Engineering
Statistics: Total Tonnage: 1,577 tonnes
Programme: 132 weeks
Completion Date:  January 2005
Overview: The East Coast Main Line Bridge is part of the Channel Tunnel Rail Link Contract CTRL 103. The through-box lattice girder rail bridge has a clear span of 75 metres and carries the new twin track rail link over the busy East Coast Main Line.

The structure was assembled using a combination of site welding and bolted joints.

The bridge is clad with an external 'cassette' type system for ease of replacement and has an internal fire and accoustic lining. The bridge was launched across the busy East Coast Main Railway Line during a 72 hour procession in 2003.
       
    Printable Copy